Energy is required for all production buildings, which can be provided by solar power plant, solar satellites or fusion power plant.
Energy per hour = 20 * level * 1.1 ^ level
Energy production is independent of economic speed of the universe.
The solar plant requires exponentially more resources to upgrade it to the next level, according to the formula:
Metal cost = 50 * 1.5 ^ level
Crystal cost = 20 *1.5 ^ level
Below is a detailed chart showing the production of metal per hour at different levels of the Solar Power Plant, along with it's cost:
Level | Energy production per Hour | Difference in Energy Production | Metal Cost | Crystal cost |
---|---|---|---|---|
1 | 22 | 0 | 75 | 30 |
2 | 49 | 27 | 112 | 45 |
3 | 80 | 31 | 168 | 67 |
4 | 118 | 38 | 253 | 101 |
5 | 162 | 44 | 379 | 151 |
6 | 213 | 51 | 569 | 227 |
7 | 273 | 60 | 854 | 341 |
8 | 343 | 70 | 1281 | 512 |
9 | 425 | 82 | 1922 | 768 |
10 | 519 | 94 | 2883 | 1153 |
11 | 628 | 109 | 4324 | 1729 |
12 | 754 | 126 | 6487 | 2594 |
13 | 898 | 144 | 9730 | 3892 |
14 | 1064 | 166 | 14596 | 5838 |
15 | 1254 | 190 | 21894 | 8757 |
16 | 1471 | 217 | 32842 | 13136 |
17 | 1719 | 248 | 49263 | 19705 |
18 | 2002 | 283 | 73894 | 29557 |
19 | 2325 | 323 | 110841 | 44336 |
20 | 2691 | 366 | 166262 | 66505 |
21 | 3109 | 418 | 249394 | 99757 |
22 | 3582 | 473 | 374091 | 149636 |
23 | 4119 | 537 | 561137 | 224454 |
24 | 4728 | 609 | 841705 | 336682 |
25 | 5418 | 690 | 1262558 | 505023 |